Duke Energy Center
Location: Charlotte, NC
Size: Fifty one-story office building
Year constructed: 2009
Year constructed: 2009
• Post-tensioned girders
• Conventionally reinforced concrete spandrel beams
• Pre-cast double-tee floor framing
• Composite steel framing at crown (top 10 floors)
• Two-story vierendeel trusses spanning 75 feet
• Triangular 3D-space truss spanning 160 feet
• Spread footings
• Conventionally reinforced concrete spandrel beams
• Pre-cast double-tee floor framing
• Composite steel framing at crown (top 10 floors)
• Two-story vierendeel trusses spanning 75 feet
• Triangular 3D-space truss spanning 160 feet
• Spread footings
Harvey B. Gantt Center
Location: Charlotte, NC
Robert L. Taylor Complex
Location: Sarasota, FL
Size: Single-story recreation facility
Year constructed: 2010
Year constructed: 2010
• Concrete masonry bearing walls
• Structural steel beams, columns and braced frames
• Open-web steel joists at roof
• Concrete post-tensioned slab
• Reinforced concrete beams and columns
• Spread footings
• Structural steel beams, columns and braced frames
• Open-web steel joists at roof
• Concrete post-tensioned slab
• Reinforced concrete beams and columns
• Spread footings
No images available.
1875 Pennsylvania Avenue
Location: Washington, DC
Size: Fifteen-story office building including a three level parking garage below grade
Year constructed: 2003
Year constructed: 2003
• Post-tensioned flat plate framing
• Reinforced sloping concrete columns
• Reinforced concrete shear walls
• Structural steel super-truss column spanning from ground level to penthouse roof supporting the curtain wall system at the atrium
• Spread footings
• Reinforced sloping concrete columns
• Reinforced concrete shear walls
• Structural steel super-truss column spanning from ground level to penthouse roof supporting the curtain wall system at the atrium
• Spread footings
No images available.
5. 505 E. Street
Location: Washington, DC
Size: Nine-story office building including a four level parking garage below grade
Year constructed: 2006
Construction cost: $40 million
Architect: Hartman-Cox & Associates
Year constructed: 2006
Construction cost: $40 million
Architect: Hartman-Cox & Associates
• Post-tensioned flat plates
• Post-tensioned spandrel beams
• Reinforced sloping concrete columns
• Reinforced concrete shear walls
• Secant piles at basement walls
• Spread footings
• Post-tensioned spandrel beams
• Reinforced sloping concrete columns
• Reinforced concrete shear walls
• Secant piles at basement walls
• Spread footings
No images available.
Grand Central Brewhouse
Location: Saint Petersburg, FL
Size: Two-story Brewery and Two-story Restaurant
Year constructed: 2020
Year constructed: 2020
• Concrete masonry bearing walls
• Structural steel beams and columns
• Engineered glulam beams
• Steel decking with concrete topping
• Open-web steel joists at floor and roof
• Reinforced concrete beams and columns
• Spread footings
• Structural steel beams and columns
• Engineered glulam beams
• Steel decking with concrete topping
• Open-web steel joists at floor and roof
• Reinforced concrete beams and columns
• Spread footings
Island Pearl Medical Office Complex
Location: Cape Coral, FL
Erving at Park Lake Townhomes
Location: Orlando, FL
Urbana Townhomes
Location: Saint Petersburg, FL
801 Conway Townhomes
Location: Saint Petersburg, FL
357 5th Street Condominiums
Location: Saint Petersburg, FL
Domus Urbana Condominiums
Location: Saint Petersburg, FL
Size: Five-Story Condominium Building
Year constructed: 2021 (anticipated)
Year constructed: 2021 (anticipated)
• Post-tensioned flat plate at podium level
• Conventionally reinforced concrete beams
• Pre-Engineered wood floor and roof trusses
• Concrete masonry and conventional wood framed load bearing walls
• Spread footings
• Conventionally reinforced concrete beams
• Pre-Engineered wood floor and roof trusses
• Concrete masonry and conventional wood framed load bearing walls
• Spread footings
No images available.
Tuscan Reserve Apartments
Location: Palm Coast, FL
New College of Florida Student Housing Complex
Location: Sarasota, FL
Size: Six Two-Story Student Housing Buildings
Year constructed: 2008
Year constructed: 2008
• Conventionally reinforced concrete columns and beams
• AAC (Autoclaved aerated concrete) wall and floor panels
• Miscellaneous structural steel framing
• Spread footings
• AAC (Autoclaved aerated concrete) wall and floor panels
• Miscellaneous structural steel framing
• Spread footings
No images available.
Lady Lake Adult Living Facility
Location: Lady Lake, FL
Size: Three Story Adult Living Complex
Year designed: 2012
Year designed: 2012
• Precast hollow-core planks
• Conventionally reinforced concrete beams
• Pre-Engineered wood roof trusses
• Concrete masonry load bearing walls
• Spread footings
• Conventionally reinforced concrete beams
• Pre-Engineered wood roof trusses
• Concrete masonry load bearing walls
• Spread footings
No images available.
Sunlake Academy of Math and Science
Location: Lutz, FL
North Pointe Church
Location: Lutz, FL
Size: Single-Story Sanctuary Building and Office Building
Year designed: 2017
Year designed: 2017
• Pre-engineered metal building framing
• Concrete masonry load bearing walls
• Steel roof decking
• Open-web steel joists at roof
• Spread footings
• Concrete masonry load bearing walls
• Steel roof decking
• Open-web steel joists at roof
• Spread footings
No images available.
Florida Islamic Center
Location: Minneola, FL
Size: Two-Story Mosque Building and Office-Classroom Building
Year designed: 2021
Year designed: 2021
• Pre-engineered metal building framing
• Concrete masonry load bearing walls
• Composite steel floor framing
• Steel roof decking
• Open-web steel joists at roof
• Spread footings
• Concrete masonry load bearing walls
• Composite steel floor framing
• Steel roof decking
• Open-web steel joists at roof
• Spread footings
No images available.
Napleton Chrysler Jeep Dodge RAM
Location: Clermont, FL